IZO-FIX ADHESIVE AND PLASTER MORTAR FOR THERMAL INSULATION BOARDS

IZO-FIX ADHESIVE AND PLASTER MORTAR FOR THERMAL INSULATION BOARDS
Description

  video

 

ASLAN “IZO-FIX” ADHESIVE AND PLASTER MORTAR FOR THERMAL INSULATION BOARDS

Description: A high-performance, cement-based, polymer-modified adhesive and plaster mortar with fine aggregates, specially formulated for bonding and coating thermal insulation boards such as XPS, EPS, and basalt mineral wool.

Areas of Application: Suitable for interior and exterior use in bonding and plastering EPS, XPS, basalt mineral wool, polyurethane boards, and similar thermal insulation materials.

Advantages: Easy to apply, provides excellent adhesion. Resistant to water and frost. Its flexible structure is not affected by temperature changes. Offers high stability, does not sag or crack.

Surface Preparation: Application surfaces and boards must be solid, clean, and free from dust, oil, paint, silicone, curing agents, detergents, and any substances that may prevent adhesion. Boards to be bonded and plastered must be firmly fixed in place, and gaps between boards must be filled with the same material.

Mortar Preparation: Add 25 kg of ASLAN “IZO-FIX” into approximately 7 liters of clean water and mix thoroughly using a low-speed mixer or trowel until a homogeneous mixture without lumps is obtained. Let the mixture rest for 3–5 minutes for maturation, then remix before use. The prepared mortar must be consumed within 2 hours.

Bonding Application Instructions: The surface must be free from dust, oil, paint, and similar contaminants. If the surface temperature exceeds +25°C, lightly moisten it with water. Slowly pour one bag (25 kg) of dry mortar into a container containing clean water in the appropriate ratio and mix preferably with a mixer until lump-free. Let the mixture rest for 3–5 minutes, then remix for another 3–5 minutes before application. Spread the mortar firmly onto the surface and comb with a suitable notched trowel. Insulation boards should be bonded onto the combed mortar within 10–15 minutes. The prepared mortar should be used within 60–90 minutes. Do not re-temper by adding powder or water. Plastering should be carried out 24 hours after bonding. Ambient temperature should be between +5°C and +35°C.

Plastering Application Instructions: At least 24 hours after bonding and mechanical fixing, apply the first coat of plaster approximately 2 mm thick using a trowel. While the mortar is still fresh, embed the synthetic reinforcement mesh from top to bottom, pressing and stretching it into the mortar. After approximately 6 hours, lightly moisten the surface and apply the second coat, about 2 mm thick, fully covering the mesh and smoothing the surface. To prevent cracking, overlap the mesh by at least 10 cm at joints. For painting, wait 2–3 days depending on weather conditions and application thickness. If ASLAN COAT-EX Decorative Mineral Plaster is to be applied, after initial curing apply ASLAN BETO-KONTAKT Plaster Primer, and once the primer has dried, proceed with the final coating.

Consumption: 4.5 – 5 kg/m² at 5 mm thickness (may vary depending on the application method).

Precautions: Avoid application at temperatures below +5°C and above +35°C. Do not apply on frozen surfaces, in conditions with risk of frost within 24 hours, or under direct sunlight and strong wind. After application, protect the surface from rain, snow, and severe cold until cement setting is completed (approximately 1 week). Never add powder or water to mortar that has exceeded its pot life.

Packaging: 25 kg polyethylene-reinforced kraft paper bags.

Shelf Life: 12 months when stored unopened, in dry conditions, stacked up to 10 layers on pallets.

Health and Safety: As with all chemical products, avoid contact with food, skin, eyes, and mouth during use and storage. In case of accidental ingestion, seek medical attention immediately. In case of skin contact, wash thoroughly with plenty of water. Keep out of reach of children.

Specifications
• Water / Adhesive Ratio:
2,5 - 3 liters of water per 10 kg
• Initial Setting Time:
≥ 60 minutes
• Final Setting Time:
300 minutes
• Compressive Strength:
≥ 6 N/mm² (CS IV)
• Bond Strength:
≥ 0.3 N/mm² (FP:B)
• Capillary Water Absorption:
W0
• Water Vapor Permeability Factor:
≤ 25
• Thermal Conductivity (λ):
≤ 0.79 W/m·K
• Reaction to Fire:
A1
• Consumption Rate:
950 – 1000 g/m² per 1 mm thickness